ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT
NOTICE OF PROPOSED SYNTHETIC MINOR OPERATING PERMIT
AND REQUEST FOR COMMENTS
FACILITY NO. [103-0046]
PUBLIC NOTICE
CONECUH COUNTY
Pruet Production Company has applied for Synthetic Minor Operating Permit No. 103-0046-X002 which would authorize the construction of an additional well, ATIC 33-8 No. 1 Oil and Gas Production Well, to be located in Section 33, Township 4 North, Range 7 East, in Conecuh County. This well will be included in the newly designated Barnett Area No. 1 Oil and Gas Production Facility, which includes the existing Barnett Plant and the ATIC 34-12 No. 1 Oil and Gas Production Well. Emissions would be minimized by capturing the gas from both wells, routing it to the gas plant for processing and treatment, then sending the gas to the sales pipeline. Flaring or venting of the produced gas from either well will be limited to emergencies, wells/gas plant shutdowns, compressor blowdowns, and maintenance or equipment repair. The facility has taken limits on the emissions of carbon monoxide (CO), volatile organic compound (VOC), individual hazardous air pollutants (HAPs) emissions, and total combined hazardous air pollutants, to help minimize emissions.
ADEM has determined that the equipment/operations proposed by the company should be able to meet State and federal air pollution control requirements.
The following are links to the proposed permit and the Department’s permitting determination and analysis:
Proposed PermitPersons wishing to comment may do so, in writing, to the Department’s named contact below within 15 days following the publication date of this notice. In order to affect final decisions, comments must offer technically substantial information that is applicable to the proposed application. All comments must be received in the ADEM Main Office in Montgomery no later than 5:00 P.M. on the last day of the comment period.
Aubrey H. White III, Chief
ADEM-Air Division
1400 Coliseum Blvd.
[Mailing address: PO Box 301463; Zip 36130-1463]
Montgomery, Alabama 36110-2400
(334) 271-7861
airmail@adem.alabama.gov
A written request for a public hearing may also be filed within that 15-day period and must state the nature of the issues proposed to be raised in the hearing. The Director shall hold a public hearing whenever it is found, on the basis of hearing requests, that there exists a significant degree of public interest in the permit application or draft permit.
After consideration of all written comments, review of any public hearing record, and consideration of the requirements of the Alabama Air Pollution Control Act, the Federal Clean Air Act and applicable regulations, the Department will make a final determination. The Department will develop a response to comments, which will become part of the public record and will be posted to the Department’s eFile system.
Copies of the complete project file are available for public inspection Monday through Friday (except legal holidays), 8:00 a.m. to 5:00 p.m., at the ADEM Main Office at the address listed above. For convenience, documents that exist in electronic format may be accessed in the Department's document management system, eFile. To view these documents, select Media Area “Air”, enter the facility number shown above as the Permit Number, select Document Type “Permitting”, and press Search. The most recent documents will be listed at the top by default. The Document Type may also be left blank, which will list all electronically available air files for this facility.
The Department maintains a list of interested individuals who are emailed legal notices regarding proposed permits. If you wish to receive such notices, please sign up here.
This notice is hereby given this 18th day of November 2026 by authorization of the Alabama Department of Environmental Management.
_________________________
Edward Poolos
Director
Nondiscrimination Statement: The Department does not discriminate on the basis of race, color, national origin, sex, religion, age or disability in the administration of its programs.