ALABAMA DEPARTMENT OF ENVIRONMENTAL MANAGEMENT
NOTICE OF PROPOSED RENEWAL OF AN INDUSTRIAL WASTE LANDFILL PERMIT UNDER THE
ALABAMA SOLID WASTES & RECYCLABLE MATERIALS MANAGEMENT ACT AND REQUEST FOR
COMMENTS

PUBLIC NOTICE – 422

CALHOUN COUNTY

Huron Valley Industrial Landfill has submitted to the Alabama Department of Environmental Management (ADEM) an application for renewal of the Solid Waste Disposal Facility Permit for the Huron Valley Industrial Landfill (Permit 08-18). The waste stream for the Huron Valley Industrial Landfill would remain nonhazardous industrial wastes, including soil, rock, plastic, rubber, glass, fibrous materials, and residues from the resource recovery plant. The service area for the Huron Valley Industrial Landfill would remain Huron Valley Steel Recycling Facility in Anniston, Alabama. The maximum average daily volume of waste disposed at the Huron Valley Industrial Landfill would remain 2,000 tons per day. All conditions of the current permit, including previously approved variances, have been requested and would be granted in the renewed permit.

The Huron Valley Industrial Landfill is located in the Southeast ¼ of Section 34, Township 15 South, Range 7 East in Calhoun County, Alabama. The Huron Valley Industrial Landfill consists of approximately 242.4 acres with 125.9 acres approved for disposal.

Copies of the public notice, permit application, and proposed permit are available for public inspection via the ADEM website at http://adem.alabama.gov/public-notices and are available at the following location Monday – Friday (except legal holidays), 8:00 am to 5:00 pm, by appointment. A nominal fee for copying and/or mailing may be charged. Arrangements for copying should be made in advance.

Russell A. Kelly, Chief
Permits and Services Division
ADEM
1400 Coliseum Blvd.
[Mailing address: PO Box 301463; Zip 36130-1463]
Montgomery, Alabama 36110-2400
(334) 271-7714
permitsmail@adem.alabama.gov

Persons wishing to comment may do so, in writing, to the Department's named contact above within 35 days following the publication date of this notice. In order to affect final decisions, comments must offer technically substantial information that is applicable to the proposed permit.

A written request for a public hearing may also be filed within that 35-day period and must state the nature of the issues proposed to be raised in the hearing. The Director shall hold a public hearing upon receipt of a significant number of technical requests.

After consideration of all oral and written comments and consideration of the requirements of the Alabama Solid Wastes & Recyclable Materials Management Act and all other applicable regulations, the Department will make a final determination on the proposed permit. The Department will develop a response to comments which will be posted to the Department’s website at http://app.adem.alabama.gov/eFile/. To find the response to comments and final permit determination, you may search by the permit or facility number listed in this notice.

The Department maintains a list of interested individuals who are emailed legal notices regarding proposed permits. If you wish to receive such notices, please sign up here. (The link is https://adem.alabama.gov/email-notification.)

This notice is hereby given this 18th day of March, 2026, by authorization of the Alabama Department of Environmental Management.

____________________________
Edward F. Poolos
Director

Nondiscrimination Statement: The Department does not discriminate on the basis of race, color, national origin, sex, religion, age or disability in the administration of its programs.